Sizes: 56-62 and 68-74
The data for the larger listed in brackets if only one number is given, it applies to both sizes.

You will need: 
  • 250 (300) g of white yarn (100% cotton, 193 m/50 g) 
  • hook № 2,5.
Basic pattern: the number of loops multiple of 8 + 2. Knit for the scheme. It shows only the front rows in the ranks backstitches knit all sts in pattern, yo provyazyvayut Wrong. Unless otherwise noted, to begin with loops before rapport, then repeat loop repeat, after finishing loops repeat. 1 x run from the 1st to the 5th p., Then repeat with the 2nd to the 5th row.

Density knitting 4 rapport n = 32 temperature. n = 8 inlaid edge knobs and 17p. = 10 x 10 cm.

Jacket:
Begin to knit a whole. + The back shelf: to link the chain of 162 (194) for air. section and perform the 2nd paragraph of the hook 1 tbsp. b / n, then knit the basic pattern for the scheme. Run 20 (24) repeat. In 12 (14) cm from the edge of the dial pad made armholes. For the right shelves continue to knit loop 4 (5) repeats. After 19 (23) cm from the left edge of the dial pad to neckline in every 2 p. 4 x 4 in A by 24 (28) cm from the edge of the dial pad to finish the shelf.

Left front: symmetrical finish. Then finish the back. For this medium knit 9 (11) repeats. 24 (28) cm from the edge of the dial pad to finish.

Sleeve: knit top in the direction of the arrow in the diagram. Link in the chain of 82 (90) for air. section and perform the 2nd paragraph of the hook 1 tbsp. b / n, then knit pattern on the main circuit, complete 10 (12) repeats. Simultaneously, to turn down the bevels on both sides, starting at 2 cm from the edge of the dial pad, 4 (6) x 1 st alternately every 4th and 6th p. and 1 x 4 in the 6th p. In 15 (19) cm from the edge of the dial pad to finish.

Assembly: do stitches, Sew sleeve. Tie the edge of the neck, down jacket and vertical edges of the shelves from the inside one circular p. Art. b / n and perform the 1st p. scheme. Unscrew the two cords, each of the 4 strands of length 50 cm and sew the cords to the neckline.

Coif:
Assign a chain of 34 temperature. section and perform the 2nd paragraph of the hook 1 tbsp. b / n, then knit the basic pattern for the scheme. At 11 cm from the edge of the dial pad to add on both sides 1 x 4 1/2 repeat, that is, the temperature 36. § Worked on 13 repeats. After 21 cm from the edge of the dial pad to finish. Run rear side seams cap. The lower edge of cap tie as the edges of the jacket. Run 2 cord for both the jacket and sew cap.

Shoes:
For the bottom part of the chain link 13 temperature. section and perform the 2nd paragraph of the hook 1 tbsp. b / n. 1st circular p.: In the next 10 temperature. n run for 1 st. b / n, in the next st 3 tbsp. b / n the other hand the chain link 10 st. b / n, 2 tbsp. b / n in the next st, finish circular p. Comm. Art. N = 26

Mark for the additions to 3 external st each side. From 2 to 7 and the circular p.: Art. b / n, to perform the addition of rounding as follows: in the 2nd circular p. 3 double marked loops in the 3rd circle, p. double the 1st, 3rd, 4th and 6th loop. In the 4th circle, p. double 3rd and 8th paragraph in the 5th circle, p. double the 1st, 5th, 8th and 12th paragraph in the 6th circle, p. double the 4th, 7th, 10th and 13th paragraph in the 7th circle, p. double 3rd, 8th, 13th and 18th n = 68 n then all loops run 1 and p. scheme. 9th circular p.: Run Comm. Art. in Art. b / n the 8th round r., with 14 x miss every 4 n = 53 n Beginning in the 10th round r., knit semistable. with trebles. From the 11th round r. average mark 9 § front and perform further subtraction, provyazyvaya on both sides of the loop labeled 1 x 2 sts together.

11th and circular p.: subtract loops on both sides of the middle section 9 of the 12th circular p.: dec loops on both sides of the average 7 sts 13th circular p.: subtract the loop on both sides of the average 6 § 14th circular p.: subtract loops on both sides of the middle section 5 of the 15th circular p. : turn down the loop on both sides of the middle 3 sts 16th circular p.: knit middle section 9 of Art. b / n and then leave these loops. The remaining 33 para knit direct and inverse series for the top of the shoe. Openings for cable run 1 p. as follows: * 1 semistable. snakidom, 1 temperature. sts, skip 1 st of the previous row, repeat from *. From the 17th to the 20th p.: Semistable. snakidom. 21 and p.: Tie edge shoe 1 p. knobs = 2nd p. scheme.

Roll up to 1 cord length of 40 cm and to pass them through the hole openwork series.